Speedy

LB Speedy has a wide range of marine equipment enabling her to provide a variety of services for the installation and removal of pipelines. It is 260' x 16' x 72' and comes with Manitowoc 4100-W and 4000-W cranes.

Pipe Lay & Recovery Barge

  • Lay & Recovery Capabilities

    2' thru 24'

  • Recovery Mode

    80' sections of P/L at a time

  • Diving

    Surface Air & Gas and Optional Mobile Saturation System

Specs

Length

260'

Hull Depth

16'

Width

72'

Clear Project Deck

11,000 sq ft

Operating Draft

7'

Quarters

88

Hospital Beds

2

Classifications

USCG Cert

Yes

Flag

USA

Capacities

Fuel

160k USG

Cargo Water

400k USG

Dive Equipment

Deco Chamber

2 Deco Chambers

Air & Gas Diving System

Mobile Sat System (Optional)

Mechanical Equipment

Main Generators

3 x 445 kw

Barge Air Compressors

2 x 212 cfm @ 125psi

Emergency Generator

1 x 150 kw

Communications and Electronics

V-Sat Phone and Internet

Yes

Marine VHF, SSB

Yes

Cranes

Manitowoc 4000 W

Stern 120' Boom (160' if needed)

Manitowoc 4000 W

Bow 120' Boom (140' if needed)

Pipe Laying Equipment

Work Stations

3 x Welding Stations 1 x X-Ray Station 1 x Field Joint Station

Welding Machines

8 x Miller 400 amp

Pipe Tensioner

80 Kips - Hydraulic Power Dynamics, Inc.

Abandon / Rec. Winch

80 Kips

Stinger

1 x 66 Ft

Mooring System

Anchors

8 x 14,000 lb

Mooring System Type

Delta Flippers

Winches

4 x Double Drum

Bow Mooring Winch

5K' of 1.5' Anchor Wire 121K lb

Stern Mooring Winch

5K' of 1.5' Anchor Wire 121K lb

Breast Mooring Winch

4K' of 1.25' Anchor Wire 70K lb

Alternate Spuds

2 x 60' (Optional)

Pipe Bury Equipment

Jet Sled

Pulled Adjustable for Pipe Size & Depth

Jet Pump

(2) Bingham 6'x10', 2 stage (2) Catepillar V12, 1175 HP 2800 GPM at 500 PSI each (2) 900 CFM Air Compressors